2010 – Gulf of Mexico Subsea Cable Repair
- Installed a repair section of 3/C – 8KV, #2 AWG, EPR submarine cable between two platforms..
- Placed Submar Mats to stabilize the cable subsea.
- Performed subsea cable splice and pulled new cable up platform riser.
- Installed stainless steel junction box, routed new CLX cable and performed topside inline splices.
- Installed new cable terminations at both platforms.
- Completed Incident Free.